Company Details
  • Shandong Zeyu Heavy Industry Science and Technology Co.,Ltd.

  •  [Shandong,China]
  • Business Type:Manufacturer , Service , Trade Company
  • Main Markets: Africa , Americas , Asia , Caribbean , East Europe , Europe , Middle East , North Europe , Oceania , Other Markets , West Europe , Worldwide
  • Exporter:21% - 30%
  • Certs:ISO14001, ISO9001, OHSAS18001, CCC, CE
Shandong Zeyu Heavy Industry Science and Technology Co.,Ltd.
Product Categories
Online Service
http://www.sdjzcseriesdrumconcretemixer.comScan to visit
Home > News > What problems should be paid attention to in small concrete mixing station wire rope lubrication?
News

What problems should be paid attention to in small concrete mixing station wire rope lubrication?

Small concrete mixing station wire rope lubrication is very important, according to the use of the lubrication period to determine regular lubrication.During lubrication, special attention should be paid to the area in contact with the pulley and other parts that are difficult to check and repair. The lubricant should meet the requirements of the rope and do not affect the appearance inspection.

Q: What is the maximum towing speed of the mobile station, say 25 km/h?Answer: less than or equal to 25km/h.

Q: Is there a limit on the distance the mobile station can travel continuously, such as up to 100 km?

A: Our equipment is not allowed on the road at present. It is only suitable for short distance walking.

Q: What is the cost of infrastructure construction of various types of mixing stations?

Answer: Mixing station with three cement silos costs about 40,000 yuan;Mixing building steel structure batching machine, with four cement silos, about 150,000 cost;Floor warehouse type batching machine about 200 thousand.

Q: What grade concrete can be produced by simple 25 stations?

Answer: concrete mixing station regardless of size, as long as according to the same ratio, the concrete quality is the same.

Q: How long is the service life of your mixing station?Answer: the service life of mixing station is closely related to personal maintenance.Maintenance, maintenance good more than ten years no problem.

Q: What equipment is there in addition to the auxiliary equipment of the mixing station?Answer: a complete set of concrete company composition: mixing station, tank truck, pump truck, loadometer, laboratory, environmental protection treatment system, personnel.

Q: What are the differences between concrete mixing station and engineering mixing station?

A: There is no significant difference in the configuration of the two devices.The Commercial Concrete Mixing Station is stronger than the engineering station in environmental protection, production efficiency and appearance.Engineering stations have relatively high requirements for measuring accuracy of equipment or continuous combat capability of equipment

Share to:  

Mobile Website Index. Sitemap


Subscribe To Our Newsletter:
Get Updates, Discounts, Special
Offers and Big Prizes!

MultiLanguage:
Copyright © 2024 Shandong Zeyu Heavy Industry Science and Technology Co.,Ltd. All rights reserved.
Communicate with Supplier?Supplier
ZEYU Mr. ZEYU
What can I do for you?
Contact Supplier